What information should businesses provide when requesting curtain walling repairs?

Businesses should provide the property address, a clear description of the curtain walling defect, photographs where possible, and details of the affected elevation, panel or glazing unit. It is also helpful to include approximate dimensions, access arrangements, site restrictions and any relevant drawings, previous repair records or safety requirements so GlassPlus UK can assess the work accurately.

The most useful repair request gives GlassPlus UK enough information to understand the defect, assess its likely cause, and plan the work within the building’s operational and safety requirements. In addition to the basic site and defect information, businesses should explain the following.

Business impact and priority

State whether the issue is affecting tenants, staff, visitors, trading areas or building security. Explain what outcome is required, such as restoring weather resistance, resolving a draught, addressing a loose component or making the façade safe. A clear priority helps the contractor distinguish between damage requiring prompt attention and work that can be planned as part of wider maintenance.

What has happened and when

A brief timeline is valuable. Include when the problem was first noticed, whether it followed severe weather, impact, nearby construction or other building work, and whether the condition has changed. If the defect is intermittent, describe when it occurs. For example, water penetration may only be visible during wind-driven rain, while movement or rattling may be more noticeable at particular times.

Relevant façade and building information

Where known, provide details of the building’s age, recent refurbishment history and the type of curtain walling system. Information about unusual interfaces, such as connections with roof edges, balconies, parapets or adjoining cladding, may also help. Businesses should mention any known movement, settlement, recurring leakage or previous alterations around the affected area, as these factors can influence whether a repair addresses the cause rather than only the visible symptom.

Site management and permissions

Identify the person responsible for approving the work and the person who will coordinate the contractor on site. It is also helpful to confirm whether the building is freehold, leasehold or managed on behalf of another owner, and whether landlord, managing agent or tenant approval is needed. If the property is listed, located in a controlled estate or subject to specific façade requirements, this should be disclosed at the enquiry stage.

Health, safety and building procedures

Businesses should advise GlassPlus UK of relevant site rules, induction requirements and permit systems. Any known asbestos information, hazardous materials, restricted areas or special conditions affecting work at height should be identified. The enquiry should also state whether the building has requirements for risk assessments, method statements, lifting operations, exclusion zones or coordination with other contractors.

Working conditions within the property

Explain whether the affected area is beside occupied offices, retail space, reception areas, loading points or sensitive equipment. Details of noise, dust, privacy, security and fire-escape restrictions can influence the proposed sequence of work. If the premises are used by the public or several tenants, the contractor should know how the work will need to be segregated and communicated.

Commercial and procurement requirements

Include any quotation deadline, tender format, purchase order procedure or pre-qualification requirements. Businesses should also state whether they need a formal written quotation, a condition report, method statement, programme, insurance documentation or product information before approval. Providing these requirements at the outset reduces the risk of an otherwise suitable proposal needing to be revised later.

Preferred repair outcome

If appearance is important, explain any requirements for colour, sightlines, finish, glazing performance or consistency with adjacent bays. Where the business is considering repair rather than replacement, it should say whether retaining existing components is a priority, subject to technical suitability. This allows the quotation to reflect the required standard instead of assuming that the lowest-cost intervention is acceptable.

GlassPlus UK can review the information supplied and identify where a site inspection is needed before the scope can be confirmed. A quotation based solely on written information may need qualification if concealed fixings, drainage paths or the condition of adjoining components cannot be assessed. With over 30 years of industry experience, GlassPlus UK approaches curtain walling repairs with attention to the underlying construction, safe working methods and compliance with current building and safety regulations.

Businesses should separate confirmed observations from assumptions about the cause. A request should describe what is visible or being experienced, such as a cracked pane, movement, staining or water entry, without specifying the repair method unless this has already been professionally assessed. This gives GlassPlus UK a clearer basis for reviewing the issue and helps prevent a quotation being limited to a symptom when related curtain walling components may also require attention.

Where several defects are present, each should be listed separately and linked to a clear location or reference photograph. This makes the proposed scope easier to check, compare and approve before work is arranged.

Commercial curtain wall panel showing glazing, frame and perimeter joints

Request a Curtain Walling Repair Assessment

Contact GlassPlus UK to discuss the curtain walling issue and provide the available site information. The team can advise whether a site inspection is needed before the repair scope and quotation are confirmed.