One Day
Both third-floor glazing units were replaced within a single day.
Third-Floor Access
Cranage and specialist access equipment were carefully coordinated to lift and install the large glazing units safely at third-floor level.
Matched Specification
Replacement panes maintained the façade’s appearance and thermal performance.
